Monday, March 15, 2010

Messages For Impending Baby

shortly begin work on the coast of Santa Cruz via

start soon the works of the so-called Littoral Via Santa Cruz , a work that has an initial budget of 40.2 million euros and an execution period of 30 months. This is the remodeling of the road that runs between Barranco Santos and Francisco La Roche Avenue, past the plaza in Spain. The idea of \u200b\u200bthe work is also to improve the connections of the metropolitan area with the rest of the island, increasing the permeability between the city and the coastal strip.
At this stage, and although the 'slogan' of the work is "Santa Cruz is open to the sea," we will not see the connection between the city and the sea, leaving a port belt that prevents the natural link between the two spaces. Supposedly in the next phases of the work, the connection will be effective. For now, at this point, as usual.

0 comments:

Post a Comment